Products›CFRTP Battery Pack Brackets (Continuous-Fibre Thermoplastic)
CFRTP Composites

HIMING

CFRTP Battery Pack Brackets (Continuous-Fibre Thermoplastic)

Full TDS with mechanical properties available on request — send us the part and target grade.

CFRTP Composites

CFRTP Battery Pack Brackets (Continuous-Fibre Thermoplastic)

Himing New Material (Zhongshan CSII) Co., Ltd. · IATF 16949 · ISO 9001 · CRCC · Zhongshan, Guangdong · 4 lines, 15,000 t/yr

Continuous carbon / glass fibre thermoplastic composite replacing steel brackets — 60% lighter, IP67.

Continuous-fibre reinforced thermoplastic (CFRTP) composite replacing steel brackets. 60% weight reduction, 4× corrosion resistance and IP67 sealing; remeltable and recyclable, aligned with ESG targets and EU recycled-content quotas.

  • ✓60% weight reduction versus a steel design
  • ✓4× corrosion resistance
  • ✓IP67 sealing against water and dust
  • ✓Remeltable and recyclable — aligned with EU ESPR and recycled-content quotas
  • ✓IATF 16949 quality system in place
  • ✓Custom lay-up structure and matrix resin
MOQContact sales for evaluation
Lead timeSamples 14 days · production 30 days
Packaging
  • ·Roll stock
  • ·Semi-finished pressed panels
Customization
Fibre type (CF / GF / hybrid), lay-up, matrix resin, flame retardancy
Request a quote →

Grade selection

Which grade fits your part

Like-for-like comparison on the same measured basis. Screen by flame rating first, then trade stiffness against impact.

GradeBaseGFFRTensile MPaFlex modulus MPaNotched impact kJ/m²Typical use
PA6 + 30% GF, FR V-0
PA630%V-01238,6009FR structures, electrical housings
PA66 + 30% GF, structural
PA6630%—1557,20014Under-hood brackets, end caps
PA66 + 35% GF, heavy-duty
PA6635%—1918,71321Rail fastenings, heavy structures
PP, FR V-2
PP—V-222.593562.5Corrugated tubing, lightweight guards

Measured typical values from each grade TDS; test methods are listed on the product page. Not a batch-by-batch guarantee.

Not sure between PA6 and PA66? Read the three-step guide →

Frequently asked questions

Which matrix resins are available?+
PA6 / PA66 as standard; PA46 or PEEK for higher-temperature applications; halogen-free flame-retardant systems where FR performance is required.
Why is sampling longer than for compounds?+
CFRTP involves continuous-fibre lay-up and compression moulding, so sampling takes about 14 days. Lay-up and tooling can be evaluated in parallel; production lead time is 30 days.

Need a TDS or a sample?

Tell us the part, the process and the benchmark grade — technical and sales reply within 24 hours with a full quotation.